New project this week
Started Monday finished today re the structure, just the roof felt to do on Monday, 7.5 Mtr x 3 Mtr shed, if you want pics then I will have to pee about with my phone as did not take camera, Rick
|
It would be rude not to ask for a photo Rick. You know what we're like :lol
|
A picture speaks a thousand words :lol
|
1 Attachment(s)
OK got there in the end, phone did not want to talk to lappy, this was progress as of Monday 1st day on site
|
1 Attachment(s)
And as of Thursday
|
1 Attachment(s)
Another view
|
1 Attachment(s)
And the last, sorry no pic for Friday too knackered to think about it, but suffice to say it is complete bar roof felt and hanging the two doors, Rick
|
Sorry they are 90 out but that is the way they load from my phone, there probably is a way round it but I do not know, Zac could probably correct them for me, Rick
|
1 Attachment(s)
So here is the job as it stands today, roof felt on but could not do the edges as my small torch ran out of gas, so just that to finish tomorrow, so all in 6 days, Rick ps just noticed the date is 1 day advanced on my camera
|
Looks great, you can come and build me a shed too :thumbs
|
Love to Jim but a bit far, Rick
|
Good job Rick. Is the exterior just painted osb?
|
Quote:
|
1 Attachment(s)
Space, the final frontier. :D Nice job, I'm jealous.
|
Rick, I didn't think that stuff was waterproof?
Would it not have been better to waterproof membrane, baton and clad? Or is this just a quick knock up job for a bit of quick waterproof storage type of thing? |
All times are GMT +1. The time now is 08:20. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.